New construction of a 206,000 sq. ft. two-story high school
Site development of 36.4 acres including extensive mine reclamation and grouting
Removal & relocation of wetlands
Corridors are finished with epoxy terrazzo floors
School is comprised of six learning wings. Wings one and two contain a total of 48 classrooms
The third wing houses administrative offices, a cafeteria, media center, computer lab, performing arts, and student center
The fourth wing features a 1,200-seat auditorium
The fifth wing contains two gymnasiums
The sixth wing holds an Olympic-size natatorium and industrial arts classrooms
Outdoor L.G.I. serves as additional lecture space
Click any thumbnail to view the project's details.
New construction of a 206,000 sq. ft. two-story high school
Site development of 36.4 acres including extensive mine reclamation and grouting
Removal & relocation of wetlands
Corridors are finished with epoxy terrazzo floors
School is comprised of six learning wings. Wings one and two contain a total of 48 classrooms
The third wing houses administrative offices, a cafeteria, media center, computer lab, performing arts, and student center
The fourth wing features a 1,200-seat auditorium
The fifth wing contains two gymnasiums
The sixth wing holds an Olympic-size natatorium and industrial arts classrooms
Outdoor L.G.I. serves as additional lecture space
230 East Main Street, Carnegie, PA 15106 | 724-746-1900 | 724-746-7032
Content © Nello Construction. Powered by Cyberspeed. All rights reserved.
230 East Main Street
Carnegie, PA 15106
724-746-1900
724-746-7032
Content © Nello Construction. Powered by Cyberspeed. All rights reserved.