724-746-1900

Plan Room

  • Project Details
  • Owner:
    Armstrong School District
  • Value:
    $9.8 Million
  • Location:
    Rural Valley, PA
  • Web:
  • Services:
    General Contractor
  • Architect:

New Eastern Armstrong Secondary School

New Construction 132,000 Sq. Ft. One-Story Building consisting of 23 Classrooms, 2 Computer Rooms, 3 Science Laboratory Rooms, 2 Home Economics Areas, Band, 2 Art and 2 Music Rooms, Technical Education Room, Drafting/CAD, Darkroom, Weight Room, Team Room, Locker Rooms, Kitchen, Cafeteria, Library, Industrial Arts, full Gymnasium and Auxiliary Room, Administration Area, Health Suite, 2 Principal's Offices, Conference Rooms, Guidance Office, Instructional Support Room, a Full Preparation Kitchen and Cafeteria and 2 Courtyards

The auxiliary room contains an operable partition, divider curtain, 3 volleyball courts and retractable/portable bleachers to seat 1,500

The auditorium has hardwood maple floor and red oak trim, radius sound panels, 11 curtains, and catwalk

Architectural details include a series of half-round fiberglass column covers and terrazzo tile floors that accent the numerous six-foot square skylights in the corridors

There are 2 exterior entry canopies and the main entrance is capped by a 2 x 10 entrance skylight

The extensive 28 acre site plan included the construction of a new roadway bridge, a new 1,600 lineal foot entrance roadway, paved parking for 332 cars and 27 buses, 2 football fields, 4 tennis courts as well as baseball, softball and soccer fields

Due to flood plain potential, the foundation is comprised of 1,100 augured piles and grade beam construction


Related Projects

Click any thumbnail to view the project's details.


New Eastern Armstrong Secondary School


  • Project Details
  • Owner:
    Armstrong School District
  • Value:
    $9.8 Million
  • Location:
    Rural Valley, PA
  • Web:
  • Services:
    General Contractor
  • Architect:

New Construction 132,000 Sq. Ft. One-Story Building consisting of 23 Classrooms, 2 Computer Rooms, 3 Science Laboratory Rooms, 2 Home Economics Areas, Band, 2 Art and 2 Music Rooms, Technical Education Room, Drafting/CAD, Darkroom, Weight Room, Team Room, Locker Rooms, Kitchen, Cafeteria, Library, Industrial Arts, full Gymnasium and Auxiliary Room, Administration Area, Health Suite, 2 Principal's Offices, Conference Rooms, Guidance Office, Instructional Support Room, a Full Preparation Kitchen and Cafeteria and 2 Courtyards

The auxiliary room contains an operable partition, divider curtain, 3 volleyball courts and retractable/portable bleachers to seat 1,500

The auditorium has hardwood maple floor and red oak trim, radius sound panels, 11 curtains, and catwalk

Architectural details include a series of half-round fiberglass column covers and terrazzo tile floors that accent the numerous six-foot square skylights in the corridors

There are 2 exterior entry canopies and the main entrance is capped by a 2 x 10 entrance skylight

The extensive 28 acre site plan included the construction of a new roadway bridge, a new 1,600 lineal foot entrance roadway, paved parking for 332 cars and 27 buses, 2 football fields, 4 tennis courts as well as baseball, softball and soccer fields

Due to flood plain potential, the foundation is comprised of 1,100 augured piles and grade beam construction