724-746-1900

Plan Room

  • Project Details
  • Owner:
    South Park School District
  • Value:
    $10 Million
  • Location:
    South Park, PA
  • Web:
  • Services:
    Prime General Contractor
  • Architect:

South Park Elementary School

New two-story construction built on a reclaimed strip mine site.

Extensive landscaping incorporated finished game fields (baseball & soccer fields) including fencing, athletic equipment, backstops and infield mix.

Installed additional asphalt paved parking lot areas.

Playground which incorporated a large playground and a soft play area.

Hard surface play area included a basketball court, painted hopscotch, map of the United States and a world map.

Two-story, open ceiling library/media center features acoustical sound panels, oak paneling and acoustical ceiling clouds.

Each floor has separate color scheme designating different grade levels with accent striping down corridors.

Large gymnasium/cafeteria with large stage area features acoustical sound panels and basketball court.

Completed on time and within budget.


Related Projects

Click any thumbnail to view the project's details.


South Park Elementary School


  • Project Details
  • Owner:
    South Park School District
  • Value:
    $10 Million
  • Location:
    South Park, PA
  • Web:
  • Services:
    Prime General Contractor
  • Architect:

New two-story construction built on a reclaimed strip mine site.

Extensive landscaping incorporated finished game fields (baseball & soccer fields) including fencing, athletic equipment, backstops and infield mix.

Installed additional asphalt paved parking lot areas.

Playground which incorporated a large playground and a soft play area.

Hard surface play area included a basketball court, painted hopscotch, map of the United States and a world map.

Two-story, open ceiling library/media center features acoustical sound panels, oak paneling and acoustical ceiling clouds.

Each floor has separate color scheme designating different grade levels with accent striping down corridors.

Large gymnasium/cafeteria with large stage area features acoustical sound panels and basketball court.

Completed on time and within budget.